Roles that move
power forward.
Specialized opportunities across the data center power lifecycle. Don’t see your role? Send us your profile anyway: many searches are confidential.
Interested in VP of Data Center Construction roles? Browse open searches below, or share your Resume so we can reach out when a confidential search fits.
View Open Roles ↓
Find your next role.
6 of 6 open roles
- Open roleLand Origination Manager →Powered LandPhoenix, AZMid–Senior$140,000 – $170,000Mid–Senior
- Open roleGeneration Development Manager →Onsite GenerationRemote - U.S.Senior$180,000 – $220,000Senior
- Open roleInterconnection Manager →InterconnectionCharlotte, NC (Hybrid)Senior$165,000 – $195,000Senior
- Open roleElectrical Construction Manager →Construction & DeliveryColumbus, OH (On-site)Senior$155,000 – $185,000Senior
- Open roleSubstation Design Engineer →Substations & TransmissionDallas, TXMid–Senior$130,000 – $165,000Mid–Senior
- Open roleRegulatory Affairs Director →Utility & RegulatoryWashington, DC (Hybrid)Director$210,000 – $250,000Director
Many of our searches are never posted publicly. Share your background and we’ll reach out when the right one opens.
Careers powering the AI build-out.
This directory covers roles at data center developers, AI compute companies, utilities, contractors and investors across the United States. Each listing includes the pay range, location and what the hiring company is looking for.
Many of our searches are confidential and never posted publicly. If you don’t see the right fit, submit your resume and we’ll contact you when a matching role opens.
Every application is reviewed by a GridTal recruiter, not an automated filter. We’ll reach out if your background is a strong fit, and we never share your details with a company without your permission.
Senior power roles, represented properly.
GridTal works exclusively on retained searches, which means every role we represent has a committed hiring company, a defined scorecard and a decision-maker engaged in the process.
We brief you on the company, the team and the interview steps before every conversation, share honest feedback after each stage and help you weigh offers, equity and relocation with real market data.