The data center power workforce.
What public energy data tells us about demand for the people who plan, connect and build power for data centers.
By Dylan Collins, Founder, GridTal ·
- 4.4%
Share of U.S. electricity used by data centers in 2023
About 176 TWh. Lawrence Berkeley National Laboratory projects 6.7% to 12% by 2028 (roughly 325 to 580 TWh).
Source: LBNL, 2024 United States Data Center Energy Usage Report (Dec 2024) ↗ - ~2x
Global data center electricity demand by 2030
The IEA estimates data centers used about 415 TWh worldwide in 2024 and projects around 945 TWh by 2030 in its base case.
Source: IEA, Energy and AI (Apr 2025) ↗ - ~2,600 GW
Generation and storage waiting in U.S. interconnection queues
Active queue capacity at the end of 2023, more than twice the installed U.S. generating fleet. Typical projects built in 2023 took about five years from request to operation.
Source: LBNL, Queued Up: 2024 Edition ↗
“STEM programs are a very important foundation for AI, software development, hardware, power, electronics, electrical engineering, etc. I think those skills and that time spent in an undergraduate program are absolutely crucial.”
Interconnection is the bottleneck, so interconnection people are too.
When a project's timeline depends on a queue position and a utility study, the person who manages that process controls the schedule. Experienced interconnection managers and transmission planners are the first hires we see companies prioritize.
Load growth pulls on the same small pool of substation and P&C engineers.
Every new campus needs high-voltage substations, protection schemes and commissioning. Utilities, EPCs and developers are hiring from the same group of engineers, which stretches searches and lifts pay for proven people.
Power is now a commercial skill, not only a technical one.
Securing capacity means negotiating with utilities, structuring procurement and sometimes building generation on site. That creates demand for utility relations, energy procurement and behind-the-meter leaders who can speak to both engineers and executives.
This report summarizes published figures from the U.S. Department of Energy's national laboratories and the International Energy Agency. Figures are quoted as published; follow each source link for full methodology. Hiring commentary provides GridTal's analysis of the implications for power-team hiring.
Collins, D. (2026). The Data Center Power Workforce. GridTal. https://gridtal.com/research/data-center-power-workforce
Put the research to work.
Whether you're building a power team or planning your next move, GridTal can help.