What is Interconnection queue?

The ordered list of generation, storage and large-load projects waiting for a utility or grid operator to study and approve their connection to the grid.

Every project that wants to connect to the transmission system enters a queue run by the regional grid operator (such as PJM, ERCOT or MISO) or the local utility. Projects are studied for their impact on the grid and assigned any upgrades needed before they can connect.

Queue position and study timelines decide when a data center campus can energize, which is why interconnection managers are among the most sought-after hires in data center power.